Case Studies
The following examples are actual projects that have been completed by WellDynamics. Each case includes an interactive completion diagram that provides links to the equipment that was installed.
Waterflood Control in a Multilateral Well
Case Study
Waterflood control in a multilateral well using a four-zone Digital Hydraulics™ system
Compartmentalized Reservoir
Case Study
Commingling and control of highly Compartmentalized reservoir using a five-zone Digital Hydraulics™ system
Avoiding Interventions in a Marginal Field
Case Study
Mitigation of reservoir performance uncertainty using a three-zone Direct Hydraulics system from an unmanned platform
Full Field Subsea WAG Development
Case Study
Downhole control and monitoring of water-alternating-gas-injection (WAG) using a four-zone SCRAMS ® system
Deep Water Gulf of Mexico Commingling
Case Study
The largest field-wide deployment of intelligent completion technology, with 8 of the 9 production wells of this three-field project completed as intelligent wells
|